Inspection History Details
Inspection Status: Approved
Inspection History: RESIDENTIAL INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2019 | RESIDENTIAL INTERMEDIATE | Approved | ||
| 04/24/2019 | RESIDENTIAL INTERMEDIATE | Partial Approval | 1. Need 1” clearance around hot water B-vent 2. Move pex 12” from can light at entry and in kitchen 3. Secure 4 gang box at top of stairs 4. Dwv lines not under test on 2nd floor, fill lines and retest 5. Need boca plates at dwv over bore in kitchen pantry and 1/2 bathroom on 1st floor |