Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T19CM01078
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2019 | PLUMBING - ROUGH, SOIL | Approved | ||
| 03/06/2019 | PLUMBING - ROUGH, SOIL | Correction Required | previous corrections stand. Footings, rebar and slab grade will be approved upon ground plumbing being correct and passing inspection | |
| 03/05/2019 | PLUMBING - ROUGH, SOIL | Correction Required | Fill vertical head of water for test to top of pipe. Sleeve the building drain to sewer pipe where it penetrates the footing. Rethink the water closet and lacy drain and vent piping. Vent take off is above the center line of pipe or 45’. Get 2 way clean out in the sewer line closer to th building and insider a double combie set up. Drainage and vent piping in the horizontal shall have 1/4” per foot of fall |