Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 03/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ||
| 03/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | Footing rebar to be 3” min distance from soil in any direction. Vertical rebar to be 32” OC per plan details. Plans unclear on whether a #4 top rebar is required in the footing. Slab rebar grid shall be supported out of dirt and high enough for aggregate to encapsulate it during the pour. |