Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2019 | ELECTRIC - INTERMEDIATE | Approved | Installed carrier beam and post for intermediate support of ridge beam. | |
| 03/04/2019 | ELECTRIC - INTERMEDIATE | Partial Approval | All is good except detached shed may need to move lights to accommodate 1035 corrections. | |
| 02/20/2019 | ELECTRIC - INTERMEDIATE | Denied | This permit is for a beam replacement. The scope of work being done exceeds the scope of the issued permit. Plans and permit need to reflect all new framing, windows, doors, electrical, and any mechanical or plumbing being altered, or replaced. This would include drywall, etc. |
|
| 02/13/2019 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | No plans or permit on site. Boss not on site, worker did not know which structure I was to inspect. I did short walkthrough with worker. |