Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2019 | FRAMING | Approved | Installed carrier beam and post for intermediate support of ridge beam. | |
| 03/05/2019 | FRAMING | Partial Approval | House; detached shed still needs corrections | |
| 03/04/2019 | FRAMING | Partial Approval | 1- Complete Plumbing and Mechanical work. 2-Install collar ties per approved plans. OK to proceed in areas not requiring corrections. |
|
| 02/20/2019 | FRAMING | Denied | This permit is for a beam replacement. The scope of work being done exceeds the scope of the issued permit. Plans and permit need to reflect all new framing, windows, doors, electrical, and any mechanical or plumbing being altered, or replaced. This would include drywall, etc. |
|
| 02/15/2019 | FRAMING | Partial Approval | Beam has been replaced, however intermediate work still progressing. Instructed Workman to reschedule with intermediates | |
| 02/13/2019 | FRAMING | Not ready for Inspection | No plans or permit on site. Boss not on site, worker did not know which structure I was to inspect. I did short walkthrough with worker. |