Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2019 | FRAMING | Approved | All corrections are complete | |
| 04/30/2019 | FRAMING | Not ready for Inspection | All corrections not complete. Plus exhaust fans in both bathrooms and laundry room need to be wired u |
|
| 04/29/2019 | FRAMING | Partial Approval | 1. Need to fire foam top plate penetrations at termite line in various locations. 2. Secure toilet flange in both bathrooms. 3. Need blocking on 3 sides of duct boot in 2nd bathroom. |
|
| 04/19/2019 | FRAMING | Not ready for Inspection | No corrections done Plus - new leak at pex top plate above rear hose bib - staple |
|
| 04/17/2019 | FRAMING | Denied | Clear eco 1. Bang plate over gas line at top plate in kitchen. 2. Need to fire foam top plate penetrations at termite line in various locations. 3. DWV not under test fill and retest, also master shower not under test. 4. Secure toilet flange in both bathrooms. 5. Need blocking on 3 sides of duct boot in 2nd bathroom. |