Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T19CM01021

Parcel: 12404100A


Addresses:

930 E 2ND ST


Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Permit Number - T19CM01021

Inspection Description - ELECTRIC - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
11/03/2020 ELECTRIC - FINAL Approved Approved
10/06/2020 ELECTRIC - FINAL Approved
09/30/2020 ELECTRIC - FINAL Partial Approval Partial. Room Units on Levels 11; 12; 13.
09/23/2020 ELECTRIC - FINAL Partial Approval Partial. Level #7 & 8 Electric rooms. Ensure all wall and ceiling penetrations are properly patched and fire caulked.
09/22/2020 ELECTRIC - FINAL Partial Approval Partial. Level #9 and Level #10 Electric rooms. Equipment to be energized at a later date.
09/17/2020 ELECTRIC - FINAL Denied Denied. No contact information no message
09/14/2020 ELECTRIC - FINAL Denied Denied. Electric room at Level #10; unable to inspect due to trash condition of room.
09/10/2020 ELECTRIC - FINAL Partial Approval Partial. Level #11 electric room, ensure all penetrations are properly caulked. Need protection for MC Cable running through slab.
09/04/2020 ELECTRIC - FINAL Partial Approval Partial. Electric rooms at Levels #12; 13; 14. Ensure all penetrations are properly fire caulked.
09/01/2020 ELECTRIC - FINAL Not ready for Inspection Not ready. Contractor cancelled. Will reschedule for 2 September.
08/25/2020 ELECTRIC - FINAL Partial Approval Partial. Level #13; Room Units #1300-1321. Level #14; Room Units #1400-1420.