Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2019 | ELECTRIC - FINAL | Approved | Approved for RECN PDSD needed. TEP Clearance, INCR New work complete on service panel, grounding, bonding, and new breaker box. |
|
| 03/04/2019 | ELECTRIC - FINAL | Correction Required | I see the gas bond entering w/heater closet, 2 ground rods. I did not find the water bond? Protect all #4 bonding and grounding conductors, attach to wall they are laying against. Show me a water bond. |
|
| 02/25/2019 | ELECTRIC - FINAL | Correction Required | Same as last correction Install Smoke Detector in rear bedroom, & Label Circuits RE-FEE |
|
| 02/21/2019 | ELECTRIC - FINAL | Correction Required | Install smoke detector in rear bedroom and label circuits in panel | |
| 02/19/2019 | ELECTRIC - FINAL | Not ready for Inspection | Work not Completed, install the following: Ground rods Water bond Gas bond All connections to be made using #4 Copper Building to be open for final inspection Label dead front with circuit locations |