Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2019 | ELECTRIC - SERVICE UPGRADE | Approved | Approved for RECN PDSD needed. TEP Clearance, INCR New work complete on service panel, grounding, bonding, and new breaker box. |
|
| 03/04/2019 | ELECTRIC - SERVICE UPGRADE | Correction Required | I see the gas bond entering w/heater closet, 2 ground rods. I did not find the water bond? Protect all #4 bonding and grounding conductors, attach to wall they are laying against. Show me a water bond. |
|
| 02/25/2019 | ELECTRIC - SERVICE UPGRADE | Correction Required | Same as last correction NO Water Bond Re fee |
|
| 02/21/2019 | ELECTRIC - SERVICE UPGRADE | Correction Required | Provide water bond as previously requested | |
| 02/19/2019 | ELECTRIC - SERVICE UPGRADE | Not ready for Inspection | Work not Completed, install the following: Ground rods Water bond Gas bond All connections to be made using #4 Copper Building to be open for final inspection Label dead front with circuit locations |