Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - RECONNECT
| Date |
Description |
Inspector |
Results |
Comments |
| 04/08/2019 |
ELECTRIC - RECONNECT |
|
Approved |
Clearance TEP INCR |
| 03/22/2019 |
ELECTRIC - RECONNECT |
|
Correction Required |
1- Service has been changed and is now connected; new service has no paper behind it, only plywood. 2-Electrical LB is buried in stucco, rendering it inaccessible. 3-Smoke detectors need to be installed in all three bedrooms, hallway and outside of separate bedroom. 4-Expose grounding electrode conductor and its connection to both ground rods. |
| 02/20/2019 |
ELECTRIC - RECONNECT |
|
Not ready for Inspection |
Lock box code still does not work, nor is grounding secured. Obtain permit to cover new framing and wiring work taking place inside, along with any other work requiring a permit. |
| 02/08/2019 |
ELECTRIC - RECONNECT |
|
Not ready for Inspection |
lockbox code left on message did not work. Secure grounding to house near panel |