Inspection Status: Approved
Inspection History: FIREWALL/FIREBARRIER/FIRESTOP
| Date |
Description |
Inspector |
Results |
Comments |
| 04/24/2019 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Approved |
|
| 04/19/2019 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Partial Approval |
Mostly complete above ceiling; need to fire caulk penetrations |
| 04/11/2019 |
FIREWALL/FIREBARRIER/FIRESTOP |
|
Correction Required |
Instructed builder to install 2 layers of 5/8” type X drywall to Unit B side of living room and bedroom/closet walls that are common with Unit A. Laundry room wall is plastered wall and ceiling and need not be dry walled. Drywall to extend to roof deck and be notched around joists, with holes fire-caulked. |