| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2020 | PLUMBING - ROUGH, SOIL | Approved | RVI | |
| 03/25/2020 | PLUMBING - ROUGH, SOIL | Correction Required | Inspected via Duo. Builder did not have access to the roof to verify DWV was holding. Builder did not have as-built plans as requested in previous inspection, nor were they in the record. After discussion of changes; it was agreed that these need to be approved prior to conducting this inspection. | |
| 06/14/2019 | PLUMBING - ROUGH, SOIL | Denied | 1. Rough water test leaked. Wet in bathroom area. Investigate and repair as needed. Redo test 2. Plumbing plan does not match as built. Redo layout and submit for approval. 3. Discussed with Emil. Ok to repair leak, which could just be a cap leak, retest and then backfill at their own risk. 4. Get approved as built drawing before final. |