Permit: T19CM00826

Parcel: 11006009A

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Permit Number - T19CM00826

Inspection Description - REINFORCED MASONRY PRE-GROUT

Inspection Status - Approved

Date Description Inspector Results Comments
08/07/2020 REINFORCED MASONRY PRE-GROUT Approved All three are approved.
07/28/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Partial approval ok for fence grout and five light pole bases
07/24/2020 REINFORCED MASONRY PRE-GROUT Cancelled Canceled by contractor
05/15/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Partial. Two masonry columns for canopy and south wall last lift.
05/12/2020 REINFORCED MASONRY PRE-GROUT Partial Approval RVI Partial. West side property wall 2nd lift, 4’ to 8’ East side property wall 1st lift to 4’.
05/06/2020 REINFORCED MASONRY PRE-GROUT Partial Approval RVI Grout. Partial. North side entry gate 1st lift. 0 to 4’. West side property wall 1st lift, 0 to 4’ .
04/24/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Partial. Footings/rebar for cmu wall perimeter, south side, west wall.
04/14/2020 REINFORCED MASONRY PRE-GROUT Partial Approval 3rd lift on southwest third floor stairwell
04/10/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Southwest Stairwell 3rd floor, first lift ok for concrete.
03/24/2020 REINFORCED MASONRY PRE-GROUT Partial Approval TOP OUT OF E. STAIRWELL
03/19/2020 REINFORCED MASONRY PRE-GROUT Partial Approval 2ND LIFT ABOVE 3RD FLOOR ON ELEVATOR/ENTRY WALL OK TO GROUT
03/17/2020 REINFORCED MASONRY PRE-GROUT Partial Approval RVI
EAST STAIRWELL ELEVATOR NORTH OK TO 26'
03/12/2020 REINFORCED MASONRY PRE-GROUT Not ready for Inspection Canceled by contractor.
03/10/2020 REINFORCED MASONRY PRE-GROUT Partial Approval To 16’.
02/19/2020 REINFORCED MASONRY PRE-GROUT Partial Approval 3rd lift. Grid line A 11-13.
02/13/2020 REINFORCED MASONRY PRE-GROUT Cancelled
02/12/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Top out of exterior walls, except for entry area. 4th lift for East stairs.
02/11/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Top out South wall and East stairwell.
02/10/2020 REINFORCED MASONRY PRE-GROUT Partial Approval 3rd lift, elevator. Top out West wall and North wall from West end to elevator.
02/07/2020 REINFORCED MASONRY PRE-GROUT Partial Approval 2nd lift North wall and 3rd lift. East stairs.
02/06/2020 REINFORCED MASONRY PRE-GROUT Partial Approval Top out South and West wall, and stairs.
01/30/2020 REINFORCED MASONRY PRE-GROUT Partial Approval 2nd lift, balance of West wall and South wall from West corner to sixth control joint heading East, also Southwest stairwell. 1st lift Balance of East wall; Northeast stair remains to be inspected.
01/29/2020 REINFORCED MASONRY PRE-GROUT Partial Approval 1st lift, balance of South wall and East wall from South end to fourth control joint going North. 2nd lift, North wall from West end to elevator, West end from North corner to fourth control joint going South.
01/15/2020 REINFORCED MASONRY PRE-GROUT Partial Approval From Northeast corner to west side of elevator.
01/10/2020 REINFORCED MASONRY PRE-GROUT Partial Approval 1st lift West wall, South wall from GLs 1-12, North GLs 1-10.
11/22/2019 REINFORCED MASONRY PRE-GROUT Partial Approval Third lift of stairwell grouted without inspection. I observed #4s at 32' OC and double #4s at both sides of South wall adjacent to future lintels above. Second #4 is missing from North side of basement lintel, as specified on plans. Builder will obtain RFI, as he believes this should only go to Lintel. Directed builder to contact Inspection Manager for resolution of covered work.