Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T19CM00826
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/07/2020 | REINFORCED MASONRY PRE-GROUT | Approved | All three are approved. | |
07/28/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial approval ok for fence grout and five light pole bases | |
07/24/2020 | REINFORCED MASONRY PRE-GROUT | Cancelled | Canceled by contractor | |
05/15/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Two masonry columns for canopy and south wall last lift. | |
05/12/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | RVI Partial. West side property wall 2nd lift, 4’ to 8’ East side property wall 1st lift to 4’. | |
05/06/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | RVI Grout. Partial. North side entry gate 1st lift. 0 to 4’. West side property wall 1st lift, 0 to 4’ . | |
04/24/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Partial. Footings/rebar for cmu wall perimeter, south side, west wall. | |
04/14/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 3rd lift on southwest third floor stairwell | |
04/10/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Southwest Stairwell 3rd floor, first lift ok for concrete. | |
03/24/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | TOP OUT OF E. STAIRWELL | |
03/19/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 2ND LIFT ABOVE 3RD FLOOR ON ELEVATOR/ENTRY WALL OK TO GROUT | |
03/17/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | RVI EAST STAIRWELL ELEVATOR NORTH OK TO 26' |
|
03/12/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Canceled by contractor. | |
03/10/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | To 16’. | |
02/19/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 3rd lift. Grid line A 11-13. | |
02/13/2020 | REINFORCED MASONRY PRE-GROUT | Cancelled | ||
02/12/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top out of exterior walls, except for entry area. 4th lift for East stairs. | |
02/11/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top out South wall and East stairwell. | |
02/10/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 3rd lift, elevator. Top out West wall and North wall from West end to elevator. | |
02/07/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 2nd lift North wall and 3rd lift. East stairs. | |
02/06/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top out South and West wall, and stairs. | |
01/30/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 2nd lift, balance of West wall and South wall from West corner to sixth control joint heading East, also Southwest stairwell. 1st lift Balance of East wall; Northeast stair remains to be inspected. | |
01/29/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1st lift, balance of South wall and East wall from South end to fourth control joint going North. 2nd lift, North wall from West end to elevator, West end from North corner to fourth control joint going South. | |
01/15/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | From Northeast corner to west side of elevator. | |
01/10/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1st lift West wall, South wall from GLs 1-12, North GLs 1-10. | |
11/22/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Third lift of stairwell grouted without inspection. I observed #4s at 32' OC and double #4s at both sides of South wall adjacent to future lintels above. Second #4 is missing from North side of basement lintel, as specified on plans. Builder will obtain RFI, as he believes this should only go to Lintel. Directed builder to contact Inspection Manager for resolution of covered work. |