Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T19CM00809
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/28/2020 | ENGINEERING - FINAL | Approved | . Approved. | |
08/26/2020 | ENGINEERING - FINAL | Partial Approval | Partial approval. Work has been completed on project. Provide certification letter from engineer of record that all grading and drainage and trashing closure has been Installed per approved plans For final. | |
08/25/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Complete all striping for pedestrian pathway from building one to building two and three. Provide certification letter from engineer of Record for all grading and drainage has been installed per approved plans and for trashing closure construction that was never inspected by the city of Tucson. | |
08/19/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Paving and striping contractor canceled. | |
08/17/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready.Asphalt contractor not able to complete work for inspection. | |
08/14/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Complete all notes and work on development package before calling for engineer in final. | |
06/19/2020 | ENGINEERING - FINAL | Partial Approval | Partially approved. Building two for a TCO. | |
06/10/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Provide physical separation from construction and public for TCOfor building number two. Complete all work On development package. | |
06/05/2020 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Complete all work on approved plans. |