Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2020 | FIRE SPKLR - FINAL | Approved | ||
| 06/04/2020 | FIRE SPKLR - FINAL | Partial Approval | -Install calc plate and test & drain signs. -Install spare head box. |
|
| 03/17/2020 | FIRE SPKLR - FINAL | Not ready for Inspection | Contractor called in inspection to look at underground fire line. He was told that the installing contractor needs to get an underground fire line permit through the Tucson Fire Department and then they need to call in for the inspection which requires a hydrostatic test. |