Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/25/2019 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
Unable to access for inspection. If this inspection does not pass next time, a re-inspection fee will be assessed.Knocked on door at 9:37 AM; all locked up. |
| 09/25/2019 |
PLUMBING - ROUGH, SOIL |
|
Approved |
(RVI) PLUMBING ROUGH IS INSTALLED IN A WAY THAT WILL FUNCTION ALTHOUGH IT DOES NOT MEET CURRENT IPC REGULATIONS. INFORMED HOMEOWNER OF THAT FACT AND TOLD HIM HE CAN COVER AT HIS OWN RISK. |
| 09/18/2019 |
PLUMBING - ROUGH, SOIL |
|
Cancelled |
per phone call from office. |
| 09/13/2019 |
PLUMBING - ROUGH, SOIL |
|
Cancelled |
Per phone call from builder. |