Inspection History Details
Inspection Status: Correction Required
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2019 | PLUMBING - FINAL | Correction Required | Replace electrical water bond clamp and re-wire #4 Copper OK to backfill ditch PEX and Copper installed to replace old galvanized |