Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2019 | PLUMBING - FINAL | Approved | ||
| 02/08/2019 | PLUMBING - FINAL | Correction Required | Paint ABS VTR’ s at rooftop. Drip req on water heater gas line. 18” of copper req at water heater to pet on hot and cold lines. Single vent connector cannot extend and through the roof. Use a B vent for 5’ above the w/heater draft hood through th roof. Watch manuf clearances to combustibles. Clearance. |