Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2019 | ELECTRIC - RECONNECT | Approved | fix outlets in waiting area | |
| 01/31/2019 | ELECTRIC - RECONNECT | Not ready for Inspection | no access, locked up, called 30 minutes ahead and no one showed up. Just on outside already multiple corrections. Wires need to be terminated and made safe in disconnect. Exterior receptacles need weatherproof covers. Open junction boxes need to be addressed. Will need access to panels at time of inspection. Reinstall ballard to protect transformer. | |
| 01/31/2019 | ELECTRIC - RECONNECT | Denied | Provide access to panel Z and MCC Maine for inspection Damaged wiring at rear disconnect north west corner Obtain licensed electrical contractor to clean up all expose wiring and electrical room |