Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/21/2020 |
MECHANICAL - FINAL |
|
Approved |
|
| 03/20/2019 |
MECHANICAL - FINAL |
|
Not ready for Inspection |
new electrical panel which is part of the drawings does not have any grounding, please add 2 ground rods 6 foot apart and bond gas and water. Also panel is not labeled and improperly wired. The only breaker that is labeled is for the air-conditioner is oversized see max fuse size. Didn’t see disconnect within site of condenser. Also need to provide a ladder to see work done on the roof, and make sure evaporative cooler was capped correctly |