Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date |
Description |
Inspector |
Results |
Comments |
| 04/17/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Approved |
Second lift and top out OK to grout. |
| 04/03/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
per drawings one vertical number 4 rebar from footing needs to be within 12 inches of every corner and every edge of opening. This is not the case in several locations. This should be addressed with the design team before moving forward. |
| 03/25/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
stemwall only |