Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/15/2020 |
ENGINEERING - FINAL |
|
Approved |
|
| 01/03/2020 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Provide certification letter from the engineer of record for grading and drainage. Per Dave Roberts. |
| 10/24/2019 |
ENGINEERING - FINAL |
|
Partial Approval |
Engineering has no issues with the temporary certificate of occupancy. This was a courtesy inspection for Epstein Construction. Complete the work shown on development package DP18 Dash 0124. Contractor is installing a new accessible walkway. Slope will be checked after the work is been completed. Contractor is removing dirt where required for proper drainage and water harvesting. |