Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T19CM00589
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2019 | REINFORCED MASONRY PRE-GROUT | Approved | ||
07/11/2019 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | No vehicles or humans on site. Super shack locked | |
07/09/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1- Steel reinforcement provided for the west masonry wall third lift. Okay for grout. | |
07/08/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Top of Gridline A from GL 2 to drive through window Gl 2 from A to man door top out 17-4" GL 2 from man door to B.2 16’lift Gl B.2 from GL 2-1.6 16’ -4" lift GL B from GL 1 to 2 nd control joint 16’ -4" lift GL 1 16-4" lift |
|
07/03/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1- Third lift on masonry wall is okay for grout. | |
07/01/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1- Second masonry lift is okay for grout. | |
06/27/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1- Steel reinforcement and ladder wire provided for the masonry 1st lift is okay for grout. | |
06/26/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1- Stem wall is okay for grout. |