Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T19CM00523
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2019 | ENGINEERING - FINAL | Approved | ||
| 10/02/2019 | ENGINEERING - FINAL | Not ready for Inspection | ||
| 09/30/2019 | ENGINEERING - FINAL | Not ready for Inspection | Material stock piles and debris on site, dumpster in drive-through. Drive through signage also bicycle parking is not been installed. | |
| 09/20/2019 | ENGINEERING - FINAL | Not ready for Inspection | Call for a final inspections once the work has been completed. | |
| 09/03/2019 | ENGINEERING - FINAL | Not ready for Inspection | Footing as shown on S2.0 and detail 101 is OK for concrete. Provide city approved plans. MW Morrissey. Arby’s remodel. A23 studios architect. |