Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2019 | PLUMBING - FINAL | Approved | ||
| 07/08/2019 | PLUMBING - FINAL | Denied | 1- Shall provide a water hammer arrestor for the dishwasher supply. 2-Shall provide a vacuum breaker for the master shower hand held wand. 3- Shall cap off the gas supply for the dryer. 4- Shall snap off the set screw on the front hose bib vacuum breaker. |
|
| 06/21/2019 | PLUMBING - FINAL | Not ready for Inspection | Add new gas line from meter to house not on approved plans. Provide 10lb test |