Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 02/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | Front 2 Footings on West side of Hyway, Rebar within 3” of soil | |
| 02/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | Clean out Pier Footings Maintain 3” Clearance from soil, with REBAR Special Inspections after Concrete is Poured. |