Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2019 | PLUMBING - ROUGH, SOIL | Approved | ||
| 03/08/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | 1-Need to beef up floor joists notched on bottoms (3 longer spans). 2-Master bathroom has San tee on it’s back at drain connection. 3-Vent fittings need to be sloped to drain; san Tee incorrectly oriented. OK to proceed in other areas. |