Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2019 | BUILDING PRE-SLAB | Approved | Clean out excess stands, rebar caps from slab and repair exterior form board by electrical panel before pouring |