Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T19BU00494
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2019 | BUILDING - FINAL | Approved | ||
| 12/18/2019 | BUILDING - FINAL | Continued | Slab demo and loading. Engineer and contractor had questions on several misc. items. View the removal of a small slab to west of building, no damage to property west of demo site. |
|
| 12/17/2019 | BUILDING - FINAL | Continued | Perform a wolk thru of the building at 4122 E. grant Rd. with the contractor prior to start of demolition. All interior drywall was removed during the asbestos abatement phase. Water used to control dust. Most of debri from the roof and walls has been removed by 13:12. |
|
| 12/16/2019 | BUILDING - FINAL | Continued | Visit to see if Demo site is ready. No equipment on site. | |
| 12/02/2019 | BUILDING - FINAL | Not ready for Inspection | No sign of asbestos removal. | |
| 11/22/2019 | BUILDING - FINAL | Not ready for Inspection | Precon meeting - review safety, no start without inspector touring inside building and all walls must be down by end of day or site secure to keep people out. Demolition startedat 07:25. All walls down by 10:30. |