Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/16/2019 |
BUILDING - FINAL |
|
Approved |
|
| 10/15/2019 |
BUILDING - FINAL |
|
Continued |
Breinholt Contracting Co. completed grade and gravel placement. |
| 09/23/2019 |
BUILDING - FINAL |
|
Continued |
Site graded, no D.G. |
| 09/16/2019 |
BUILDING - FINAL |
|
Continued |
No change. |
| 08/12/2019 |
BUILDING - FINAL |
|
Continued |
Slab removed, all fencing removed, front tree removed to grade, DG placed on site. |
| 08/08/2019 |
BUILDING - FINAL |
|
Continued |
Slab removed and hauled off. Fill material delivered. |
| 08/06/2019 |
BUILDING - FINAL |
|
Continued |
No call from contractor. Discovered that demolition started on structure about 11:00 am. Inspector stayed on site until all walls were down. Contractor tried to leave before all walls were down but told that either have an engineer state that the walls were completely safe to stay up or take them down. |