Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/17/2019 |
BUILDING - FINAL |
|
Approved |
|
| 10/16/2019 |
BUILDING - FINAL |
|
Continued |
Inspect sewer plug with tracer wire and wait for concrete plug on cap.Took photos. |
| 10/16/2019 |
BUILDING - FINAL |
|
Continued |
Watch the completion of site grading and spreading of the D.G. Completed. Have the excavator on site ready for loading and hauling. |
| 10/15/2019 |
BUILDING - FINAL |
|
Continued |
Walk thru at 06:45; demo started at 06:50; building down at 09:00. Trash being hauled off. |
| 10/15/2019 |
BUILDING - FINAL |
|
Continued |
Dumpster removed, Slab demolished, sidewalks at building demolished with debri piled for loading.. |