Inspection History Details
Inspection Status: Approved
Inspection History: POOL/SPA FINAL/BARRIER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2019 | POOL/SPA FINAL/BARRIER | Approved | gate on east side either install a spring hinge or keep it locked. |