Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Basin - Fair
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
| Date |
Description |
Inspector |
Results |
Comments |
| 06/03/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Fair. Project is still under construction at this time |
| 01/03/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
FAIR /BASIN UNDER CONSTRUCTION. |
| 08/05/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Basin is under construction. Rough cut basin is retaining water and has thick mud two days after last rain event. |
| 03/26/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Fair. The site is under construction at this time the basin has not been constructed |
| 10/26/2020 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
INSPECTION 09170 IS FAIR AT THIS TIME, THIS SITE IS UNDER CONSTRUCTION AND THE BASIN HAS NOT BEEN CONSTRUCTED. |
| 05/26/2020 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Fair. Site is under construction |
| 11/15/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
|
| 12/09/2019 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
The Basin has not yet been constructed. The plans are still under review. DP18-0201 |
| 03/27/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
there are several basins associated with this one address. Inspector is not able to determine which basin is represented under which activity number. The basins are basically in good shape except that the development package permit has not been completed and some minor landscaping work remains. |
| 04/12/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Under construction |
| 10/12/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Under construction |
| 12/16/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
Basin is in good condition. |