Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Basin - Fair
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
| Date |
Description |
Inspector |
Results |
Comments |
| 01/06/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Fair. Project under construction. No standing water after last rain event |
| 08/17/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Fair. Project under construction. Rough cut basins show erosion and are holding water after recent rain event. |
| 07/07/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Fair. Project is under construction. Basins have been rough cut. No issues after recent weather incident. |
| 06/29/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
FAIR SITE IS UNDER CONSTRUCTION |
| 01/28/2021 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
FAIR SITE IS UNDER CONSTRUCTION AT THIS TIME |
| 10/21/2020 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
CONDITION GOOD |
| 10/21/2020 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Site is under construction at this time. |
| 05/26/2020 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
fair. Site is under construction |
| 06/07/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Fair. Project is under construction. |
| 11/16/2022 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
|
| 12/09/2019 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
The Basin has not yet been constructed. The plans are still under review. DP18-0201 |
| 03/27/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
there are several basins associated with this one address. Inspector is not able to determine which basin is represented under which activity number. The basins are basically in good shape except that the development package permit dp18-0201 has not been completed and some minor landscaping work remains. |
| 04/12/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Community is under construction in time. Landscaping is incomplete. |
| 10/11/2023 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Fair |
Development package permit is still open at this time. Minor erosion noted. |
| 12/16/2024 |
COT - BASN - Drainage/Basin - Annual Inspection - Recur |
|
Basin - Good |
Basin is in good condition. |