Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T19BA00059

Parcel: 10611016B


Addresses:

3401 N FREEWAY


Inspection Status: Basin - Fair

Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur

Plan Number - T19BA00059

Inspection Description - COT - BASN - Drainage/Basin - Annual Inspection - Recur

Inspection Status - Basin - Fair

Date Description Inspector Results Comments
07/11/2022 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair FAIR USEING BASIN FOR PARKING
02/09/2022 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair Fair. Area being used for RV storage at this time.
09/07/2021 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair Fair. Detention area used for RV storage. No issues at this time.
04/07/2021 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair FAIR - BASIN IS BEING USED FOR RV STORAGE AT THIS TIME
11/05/2020 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair Fair. It appears as though the basin may have been leveled to allow for additional RV storage. That portion of the storage yard is at the low end end and there are currently no units stored in this location.
01/05/2023 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair Under construction at this time, although no activity
12/05/2019 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Good
04/03/2024 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair No change since last inspection
05/10/2023 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair project iunder permit at this time to add parking spaces in the location indicated for the basin. Plans of basin. I needed to make a thorough assessment.
11/13/2023 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair Work happening in the area of the basin, a re-inspection will be required within the next 6 months
12/16/2024 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair Basin still in construction phase, unfinished.