Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Basin - Fair
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
Plan Number - T19BA00059
Inspection Description - COT - BASN - Drainage/Basin - Annual Inspection - Recur
Inspection Status - Basin - Fair
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2022 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | FAIR USEING BASIN FOR PARKING | |
| 02/09/2022 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Fair. Area being used for RV storage at this time. | |
| 09/07/2021 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Fair. Detention area used for RV storage. No issues at this time. | |
| 04/07/2021 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | FAIR - BASIN IS BEING USED FOR RV STORAGE AT THIS TIME | |
| 11/05/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Fair. It appears as though the basin may have been leveled to allow for additional RV storage. That portion of the storage yard is at the low end end and there are currently no units stored in this location. | |
| 01/05/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Under construction at this time, although no activity | |
| 12/05/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 04/03/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | No change since last inspection | |
| 05/10/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | project iunder permit at this time to add parking spaces in the location indicated for the basin. Plans of basin. I needed to make a thorough assessment. | |
| 11/13/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Work happening in the area of the basin, a re-inspection will be required within the next 6 months | |
| 12/16/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Basin still in construction phase, unfinished. |