Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | WORK HAS BEEN COMPLETED NO ISSUES AT THIS TIME |
|
| 01/14/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCH ALL THE WAY ACROSS ROADWAY | |
| 01/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO WORK VISABLE AT THIS LOCATION | |
| 01/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO WORK VISABLE AT THIS LOCATION |