Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T18RW05461
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | sidewalk that had be repoured was in spec - but one panel got vandelized - called contractor and let him know that the panel needed to be repaired or replaced before permit would be approved - permit holder wasnt happy but agreed to take care of the issue - CN | |
12/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | went back out after contractor addressed the issue - work completed - close permit | |
12/13/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went out and checked the cross slope of the formed up sidewalk - i told them that it cant exced 2% - the existing is 3% - they will make a warp in panel on each end of the job and the rest will be under the 2% - they plan on pouring today - CN |