Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-Barricade Complaint Call
| Date |
Description |
Inspector |
Results |
Comments |
| 07/06/2020 |
TDOT-Barricade Complaint Call |
|
Approved |
Work has been completed. |
| 05/18/2019 |
TDOT-Barricade Complaint Call |
|
Continued |
City recieved call about non-descript "traffic control is confusing" situation. Drove project south bound and north bound. Discovered that lane shift at the south end of the project was missing several centerline VPs. They were not installed since the existing yellow stripe in this area was useable. The break in the VPs caused confusion for the inspector so the contractor was called to install. Problem was fixed aound 3:30 PM. No other issues at this time. |