Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/12/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Work completed, sidewalk not affected. |
| 12/11/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Working in dirt area, exposed 10" sewer pipe, hole in top of pipe that was due to augar placing footing for street light many years ago. Pole held in place using crane, barricades rerouting south bound traffic. |
| 12/10/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pre-con - 1 lane affected for equipment to hold pole. SW closed. Should not need asphalt or concrete work. Start 12/11/18. |
| 12/07/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Called for pre-con for 12/10 7 am |