Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 02/04/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work complete, adjustments, roadways, speed humps and stripping complete. No issues |
| 12/28/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
area repaved - still needs to have MH, valves raised - CN |
| 12/21/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
paving looks good - CN |
| 12/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
milling in progress - no traffic control on main streets - CN |
| 11/29/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out and talked with granite about not setting up traffic control before 7am - CN |
| 11/19/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
a few traffic control signs up - no sign of contractor - CN |