Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 02/13/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
10x8 patch. Matt Sierras oked the repair because the roadway was not under moritorium, it was just a long stretch of utility repair. The new water patch is good with no issues. |
| 12/20/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
call tucson water and let them know that the patch needs to be redone per standard for a new road 50 ft each way from cut and in each lane that was affected george cruz said that he would call control b and let them know - CN |
| 11/15/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
will need to be milled and paved back as it is new asphalt - CN |