Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-Routine Barricade Inspect
Permit Number - T18RW04922
Inspection Description - TDOT-Routine Barricade Inspect
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/27/2019 | TDOT-Routine Barricade Inspect | Approved | PIA permit and inspections. all work on 36th completed. | |
10/31/2019 | TDOT-Routine Barricade Inspect | Approved | All work completed. PIA project | |
10/10/2019 | TDOT-Routine Barricade Inspect | Continued | PIA inspection only, Borederland working on 36th | |
09/04/2019 | TDOT-Routine Barricade Inspect | Continued | PIA inspection only, Borederland working on 36th | |
08/29/2019 | TDOT-Routine Barricade Inspect | Continued | all work inspected by PIA inspector Alex Flores | |
04/25/2019 | TDOT-Routine Barricade Inspect | Continued | South end - working on gas line. North end - laying misc. dry utilities outside of roadway. | |
04/01/2019 | TDOT-Routine Barricade Inspect | Continued | Excavating and laying conduit for dry utilities in future roadway areas. | |
03/18/2019 | TDOT-Routine Barricade Inspect | Continued | Added dry utilities to this permit. Excavating in right of way for future roadway. placing conduit in trenches. | |
02/01/2019 | TDOT-Routine Barricade Inspect | Continued | A contractor is working in private property along south sidewalk. Does not appear to pertain to this permitted work. | |
01/16/2019 | TDOT-Routine Barricade Inspect | Continued | work almost complete, inspections being done by Mike van vleet even though he is my area. He started inspections and said he will finish them . I took over area 3 on Jan 7 | |
01/15/2019 | TDOT-Routine Barricade Inspect | Approved | Sewer line completed. Manholes all set with rings and covers placed. Have plastic sheets at rings to protect manholes until they are adjusted after roadway is completed. Permit changed to add dry utilities. | |
01/08/2019 | TDOT-Routine Barricade Inspect | Continued | Line completed up to the last man hole at Tucson Marketplace. | |
12/28/2018 | TDOT-Routine Barricade Inspect | Continued | Line backfilled, working on MH rings and covers. | |
12/20/2018 | TDOT-Routine Barricade Inspect | Continued | Sewer line installed, backfilling. No work in roadway. | |
12/13/2018 | TDOT-Routine Barricade Inspect | Continued | Working along roadway but not in roadway. | |
11/30/2018 | TDOT-Routine Barricade Inspect | Continued | Placed pipe and backfill from 36th St to drainage culvert Structure. | |
11/27/2018 | TDOT-Routine Barricade Inspect | Continued | Started at 36th St. at existing line, outside of roadway and sidewalk. Barricaded and fence. |
|
11/20/2018 | TDOT-Routine Barricade Inspect | Continued | Excavated to expose existing sleeve under culvert, barricaded, fenced off outside of roadway and sidewalk. | |
11/13/2018 | TDOT-Routine Barricade Inspect | Continued | Pre-con. 10 am at site. Scheduled to start pot holing off pavement is 11/20/18. New sewr line is being installed under future south bound lanes of Martin Luther King Jr. Way. |