Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/24/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. |
| 12/20/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Poured concrete, need to strip forms. |
| 12/19/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Sidewalks, ramps formed, subgrade compacted. Stop sign moved out of sidewalk area. Ready to pour. |
| 12/17/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
No notice from contractor. Inspected drive at north of building - OK to pour. Started pouring. |
| 11/30/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Sidewalk area cleared, barricades along curb. |
| 11/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Owner called asked if city or contractor to pay for compaction tests at sidewalks. Told him not required just need to tamp disturbed soils. |
| 11/02/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pre-con, discussed sidewalk and handicap ramp, tie-in to existing walkway at drainage. Contractor to call after forming prior to pouring. |