Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/08/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
water line installed and area temp patched. all asphalt will be repaved when the bridge is complete. Permit work is limited to a small right of way area. This project is a ADOT job. I talked with Mike Lynch at FNF construction and he will reopen permits if neccessary. |
| 01/16/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Ajo still plated, needs asphalt repair |
| 12/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
water work completed area still not paved back - CN |
| 11/30/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
water work complete - area not paved back yet - CN |
| 10/24/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
street cuts had been made and street was opened back up during the day - CN |