Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | WORK HAS BEEN COMPLETED NO ISSUES AT THIS TIME |
|
| 10/17/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | PRECON. MET ONSITE WITH CONTRACTOR. MUST MATCH EXSISTING ASPHALT AND IF HE NEEDS TO REMOVE RAMP MUST REPLACE WITH NEW ADA RAMP. MIDBLOCK. |