Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/23/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Work completed, barricades gone. |
| 10/16/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Drilling monitor well with barricades up. |
| 10/15/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pre-con. work in McKey St. behind posted address. Will start today and will be completed in 2 days. 8" well will be flush with roadway shoulder, with a 3' concrete collar. Alley will be bcrricaded closed. |