| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
went out and looked at the brick area and ramps that were repoured - they look good - close permit |
| 11/05/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
looked at the ramps that were repoured and they were good - CN |
| 10/26/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
checked the ramps that were poured they are out of spec and contractor will be doing them again - CN |
| 10/23/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
checked the layout of the south ramp - they needed to shorten the ramp to be able to make a 5x5 landing work in brick - CN |
| 10/11/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
looked at the asphalt driveway south of the original toffel job - CN |