Inspection Status: Correction Required
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T18RW04485
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/19/2019 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | Repairs at large scupper not completed. Expired permit. | |
02/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Contractor said repairs will be completed week of 2/11/19. They asked if they can pull weeds along exit ramp from Kino - told them to call for permit. | |
01/23/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | TDOT engineer approved the handrail at scupper fix. Told contractor that I will not approve the work until 2 items are corrected. | |
01/11/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Told contractor asphalt patch must be removed and replaced. Must have it inspected before placement. Confirmed by supervisor. Asphalt was placed without inspection during a cold and wet day. Concrete spillway on west side of site inspected, modified by adding extra re-bar and removal of concrete debri. Approved for pouring. |
|
12/27/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | North parkinglot entry sidewalk poured and stripped. | |
12/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Scupper (main) damaged by contractor when he hit the welded on handrail. GC instructed to have engineer examine damage and come up with repairs. | |
12/13/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspect north entry curb - OK to pour. | |
12/11/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspect for sidewalk forms and subgrade - OK to pour. | |
12/10/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Poured single scupper and sidewalk. | |
12/06/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Single scupper to be removed - not correct | |
11/30/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspection the type 2 scupper - wrong needs R&R. sidewalk subgrade needs compaction. Correct slope at sidewalk. Incorrect sidewalk form at south ramp. | |
11/19/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspected type 3 scupper forms - slab/walls. Required rebar correction before pour. | |
11/19/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspect large scupper - fix rebar. Then OK to pour. | |
11/09/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Poured curb. | |
11/08/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspected additional curb to north parking lot. | |
10/25/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Engineer has grade all wrong needs re-design. Work stopped. | |
10/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Pre-con discussed SW and curbs and barricades. Contractor to call before pours. Barricades up. |
|
10/17/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Contractor called for pre-con for 10/18/18 |