Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | Completed. | |
| 10/31/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Concrete sidewalk placed with barricades to protect the fresh concrete. | |
| 10/09/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | New hydrant installed, concrete sidewalk removed and patched with asphalt. Concrete sidewalk needs to be installed. |
|
| 09/27/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Blue stake only. |