Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/27/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | work completed - close permit | |
12/11/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | looked at the sidewalk alignment again - had them change one side so they could pour it - CN | |
12/10/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with pete and permit holder to talk about the layout for the sidewalk alignment - they hadnt layed it out like pete had directed them to last week - CN | |
11/30/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | pete and i stopped by and looked at it he said the sidewalk transition cant be more then 3 to 1 and needs to be fixed it - called terry and made sure that they knew they needed to fix it - he said that he would get with the concrete guy and then call me - CN | |
11/29/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | looked at the driveway - the score joints were wrong and the sidewalk alignment werent what we had originally talked about- will have pete come out and look at it - CN | |
10/23/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | no sign of work - CN | |
10/09/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with forman, concrete guy & designer - talked about issues with the job - CN | |
09/10/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | pre-con - talked about the sewer MH being in the way and shifting the sidewalk and driveway closer to the street - CN |